non-ISO-cosher options and towgs84/nadgrids
This actually fixes a regression introduced in PROJ 6.2.0
per 78302efb70eb4b49610cda6a60bf9ce39b82264f
that made a conversion like EPSG:4326 to "+proj=something +towgs84/+nadgrids +over +type=crs"
apply the towgs84/nadgrids operation twice.
|
|
- C API: PJ_GUESSED_WKT2_2019 is added, PJ_GUESSED_WKT2_2018 aliased to it
- C API: PJ_WKT2_2019[_SIMPLIFIED] is added, PJ_WKT2_2018[_SIMPLIFIED] alias to it
- C++ API: similarly for WKTFormatter::Convention::WKT2_2019[_SIMPLIFIED]
Those above changes should be fully backward API and ABI compatible.
projinfo changes:
- accept WKT2_2019 as value for -o switch. WKT2_2018 is still accepted (undocumented)
- output now uses 'WKT2_2019 string:', so might break scripts that would rely on that.
Other internal code references to WKT2_2018 changes to WKT2_2019, included
in tests.
|
|
|
|
+datum=NAD27 and +over, where the datum was just replaced by its ellipsoid
|
|
https://github.com/OSGeo/proj-datumgrid/pull/53)
|
|
vertical unit change (relates to https://github.com/OSGeo/gdal/issues/1561)
|
|
projected CRS using NAD83(2011) (fixes #1474)
|
|
ETRS89 (EPSG:4937), make sure that the vgridshift is applied first (ie on Amersfoort datum) before the hgridshift
|
|
geoidgrids
Fixes https://lists.osgeo.org/pipermail/proj/2019-May/008519.html
|
|
|
|
return if the intersection of the areas is empty
|
|
|
|
doing geog2D<-->geog3D conversions of same datum
Seen when testing transformations between "CR 05" (EPSG:5365) and "CR-SIRGAS" (EPSG:8907)
which require going through their corresponding 3D GeogCRS to find a Helmert
transformation.
|
|
Fixes https://bugs.chromium.org/p/oss-fuzz/issues/detail?id=14055
Credit to OSS Fuzz
|
|
Add no-op operation. It does nothing.
|
|
intermediate IDs (fixes #1343)
|
|
|
|
createOperations(): improve BoundCRS<-->non-bound-CRS case
|
|
Fixes #1301
This function takes the output PJ from proj_create_crs_to_crs(),
and add (or undo) the needed axis swap operations so that the
object returned by proj_normalize_for_visualization() has the usual
GIS axis order.
In this implementation, this does something only if the coordinate
system of the source or target CRS, geographic or projected, has
NORTH, EAST ordering.
CompoundCRS wrapping those objects are also handled.
|
|
Fixes #1388
Typically helps for
projinfo -s "+proj=longlat +ellps=GRS80 +towgs84=1,2,3 +type=crs" -t EPSG:4258
by researching operations from the pivot WGS84 implied by the towgs84 clause
to EPSG:4258.
|
|
Grid related fixes
|
|
the file system, but not in the database
|
|
even if there is one on upper node
This is a particular logic allowed by paragraph 7.3.3 Identifier
of OGC 18-010r6
|
|
|
|
|
|
|
|
transformations between geographic CRS of same datum (typically 3D to 2D)
|
|
|
|
used to know if it includes a very approximative transformation term
|
|
name we are lacking an ellipsoid height to vertCRS height correction
|
|
swap/unitconvert to avoid useless simplification rules
|
|
|
|
transformation when needed, and also sort Null geographic offset transformation in last
|
|
from X to X' in transformation name
|
|
substitution for VERTCON method
|
|
rouault/intermediate_crs_use_only_if_no_direct_transformation
Modify the default strategy of researching intermediate CRS to do it only if there is no direct transformation
|
|
cases on non-x86 arch (fixes #1275)
|
|
there is no direct transformation
|
|
|
|
the push/pop v_3 operator to preserve the Z component
|
|
from +proj=helmert/molodensky since there are ambiguities
|
|
* Make tmerc an alias for etmerc
This switches the algorithm used in tmerc to the Poder/Engsager
tmerc algorithm. The original tmerc algorithm of Evenden/Snyder
origin can still be accessed by adding the +approx flag when
initializing a tmerc projection. The +approx flag can also
be used when initializing UTM projections, in which case the
Evenden/Snyder algorithm is used as well.
If a tmerc projection is instantiated on a spherical earth
the Evenden/Snyder algorithm is used as well since the
Poder/Engsager algorithm is only defined on the ellipsoid.
+proj=etmerc can still be instantiated for backwards compatibility
reasons.
Co-authored-by: Kristian Evers <kristianevers@gmail.com>
Co-authored-by: Even Rouault <even.rouault@spatialys.com>
|
|
datum by ellps
|
|
|
|
bindins terms in generated pipeline (fixes #1232)
|
|
make proj_create() do more or less what proj_create_from_user_input() did before (fixes #1214)
|
|
CRS objects (refs #1214)
|
|
parsed appropriately on the reading side
|
|
transformation (fixes #1220)
|
|
As discussed in https://github.com/OSGeo/proj.4/issues/1214#issuecomment-452084720,
the introduction of a new PROJ.5 format to export CRS using pipeline/unitconvert/axisswap
as an attempt of improving the PROJ.4 format used by GDAL and other products is
likely a dead-end since it is still lossy in many aspects and can cause confusion
with coodinate operations.
Consequently the PROJ_5 convention will be identical to PROJ_4 for CRS export.
Note: on the import side, I've kept the code that could parse unitconvert and
axisswap when building a CRS definition from a pipeline. It is there as a hidden
feature as it was kind of a tear to remove that code in case it might still be
useful...
|