aboutsummaryrefslogtreecommitdiff
path: root/README
diff options
context:
space:
mode:
Diffstat (limited to 'README')
-rw-r--r--README132
1 files changed, 0 insertions, 132 deletions
diff --git a/README b/README
deleted file mode 100644
index aafd2dce..00000000
--- a/README
+++ /dev/null
@@ -1,132 +0,0 @@
- -------------------- P R O J . 4 --------------------
-
-PROJ.4 is a cartographic projection software.
-
-PLEASE read the following information as well as READMEs in the src
-and nad directories.
-
-For more information on PROJ.4 maintenance please see the web page at:
-
- http://proj4.org/
-
-PROJ.4 mailing list can be found at:
-
- http://lists.maptools.org/mailman/listinfo/proj
-
- ---------------------------------------------------
-
-Installation:
--------------
-
-FSF's configuration procedure is used to ease installation of the
-PROJ.4 system.
-
-The default destination path prefix for installed files is /usr/local.
-Results from the installation script will be placed into subdirectories
-bin, include, lib, man/man1 and man/man3. If this default path prefix
-is proper, then execute:
-
- ./configure
-
-If another path prefix is required, then execute:
-
- ./configure --prefix=/my/path
-
-In either case, the directory of the prefix path must exist and be
-writable by the installer.
-
-After executing configure, execute:
-
- make
- make install
-
-The install target will create, if necessary, all required sub-directories.
-
-Windows Build
--------------
-
-PROJ.4 can be built with Microsoft Visual C/C++ using the makefile.vc
-in the PROJ directory. First edit the PROJ\nmake.opt and modify
-the INSTDIR value at the top to point to the directory where
-the PROJ tree shall be installed. If you want to install into
-C:\PROJ, it can remain unchanged.
-Then use the makefile.vc to build the software:
-
-eg.
-C:\> cd proj
-C:\PROJ> nmake /f makefile.vc
-C:\PROJ> nmake /f makefile.vc install-all
-
-Note that you have to have the VC++ environment variables, and path
-setup properly. This may involve running the VCVARS32.BAT script out
-of the Visual C++ tree.
-
-The makefile.vc builds proj.exe, proj.dll and proj.lib.
-
-It should also be possible to build using the Unix instructions
-and Cygwin32, but this hasn't been tested recently.
-
-
- ---------------------------------------------------
-
-Distribution files and format.
-------------------------------
-
-Sources are distributed in one or more files. The principle elements
-of the system are in a compress tar file named `PROJ.4.x.tar.gz' where
-"x" will indicate level.sub-level of the release. For U.S. users
-interested in NADCON datum shifting procedures, additional files
-containing conversion matricies are distributed with the name
-`PROJ.4.x.y.tar' where y is an uppercase letter starting with "A."
-These supplementary files will contain compressed files and thus
-the tar file is not compressed.
-
-Interim reports on Rel. 4 proj are available in PostScript form as
-*.ps.gz . New and old users are strongly recommended to carefully read
-these manuals. They are supplements and NOT a replacement for the full
-manual OF 90-284 (which new users should also obtain).
-
- ---------------------------------------------------
-
-Principle new aspects of system:
---------------------------------
-
-ANSI X3.159-1989 C code. Site must have ANSI C compiler and header files.
-
-Several method of determining radius from specified ellipsoid.
-
-Use of initialization files through +init=file:key. Default projection
-specifications also may be defined in an ASCII file.
-
-+inv option REMOVED and -I may be used in its place. Use of invproj
-alias of proj still functions as per Rel.3.
-
-+ellps=list and +proj=list REMOVED. Use respective -le and -lp.
-
-+units= to specify cartesian coordinate system units. To get list
-use -lu.
-
--v added to dump final cartographic parameters employed.
-
-Addition of computing scale factors and angular distortion added through
--S option. Valuable for designing new projection parameter details.
-
--V option which verbosely lists projected point characteristics.
-
-Programmers may use projection library with calls to pj_init,
-pj_fwd, pj_inv and pj_transform.
-
-Program nad2nad for conversion of data to and from NAD27 and NAD83
-datums.
-
-Program cs2cs for converting between coordinate systems, with optional
-datum translation.
-
--------------------------------------------------------------
-
-Things currently left undone:
-----------------------------
-
-proj_def.dat NOT fully in place. Needs additional settings for
-many of the projections. Probably will not be completed until main
-manual rewritten.