aboutsummaryrefslogtreecommitdiff
path: root/docs/source/operations/operations_computation.rst
diff options
context:
space:
mode:
Diffstat (limited to 'docs/source/operations/operations_computation.rst')
-rw-r--r--docs/source/operations/operations_computation.rst2
1 files changed, 1 insertions, 1 deletions
diff --git a/docs/source/operations/operations_computation.rst b/docs/source/operations/operations_computation.rst
index 6f0bf386..85cbfa09 100644
--- a/docs/source/operations/operations_computation.rst
+++ b/docs/source/operations/operations_computation.rst
@@ -449,7 +449,7 @@ If one forces the datum hub to be considered to be EPSG:4326, ones gets:
Those operations are less accurate, since WGS 84 is assumed to be equivalent to
GDA2020 with an accuracy of 4 metre. This is an instance demonstrating that using
-systematically the WGS 84 hub can be sub-optimal.
+WGS 84 as a hub systematically can be sub-optimal.
There are still situations where the attempt to find a hub CRS does not work,
because there is no such hub. This can occur for example when transforming from